Views of the future man cave.
Probable enough room for at least six trainers at the moment. Could barely see the floor when we moved in.
The cabinets and workbench along the wall are coming down. Not only are they terribly constructed and ready to fall down but, they are blocking the cracks in the wall that have clearly been leaking all over the floor. Once the multiple leaky cracks and rod holes are fixed, I plan to paint the walls, somehow fill the cracks in the floor, paint them and hopefully use the remains of the current cabinets to reconstruct some more structurally sound shelving and workbench.
December 06, 2010
Subscribe to:
Posts (Atom)